Black Pearl provided special technical equipment for the reconstruction of Beli Lom river bridge , village of Pisanec.
Black Pearl provided specialized technical equipment for the rehabilitation of Beli Lom river bridge, village of Pisanetc, on the road Rousse – Razgrad.
The bridge is 383 meters long and 65 meters high. It was built in 1974 and so far no rennovations have been made.
For the reconstruction purposes of the bridge Black Pearl provided 4 electrical platforms of the highest class CAMAC – 3000. They have been used for reconstruction of the columns of the bridge.
For the renovation of the road with the direct cooperation of Black Pearl a specialized hanging platform was created.
MAXI platform is 13 meters and moves up/down through OCTO- hoist , and from left/right by suspension beams controlled distantly by control panel in the platform.
This fully engineering product has been designed and executed by Belgium company SKY MAN, which exclusive partner for Bulgaria is a company Black Pearl